Open to traffic after 24 hours.
disrapid industrial flooring
disrapid

Our fastest-setting floor: open to traffic after 24 hours, ready for coating after 36 hours.

Areas of application

  • Refurbishment projects requiring rapid loading
  • as a substrate for coatings
  • as a levelling and smoothing layer

Standard version

  • 1.0 – 5.0 cm d i s r a p i d – Industrial flooring

Load-bearing capacity

  • Can be walked on after 12 hours,
  • Fully load-bearing after 2 days and sufficiently dry to accommodate reaction resin coatings (< 4 % residual moisture)

Surface

  • Sealed
  • non-slip
  • natural grey
  • oil and water resistant
  • abrasion resistance <= 10–12 cm³/50 cm²

Flatness

  • In line with the level of the existing concrete substrate,
  • if necessary, installation in accordance with DIN 18 202, Table 3, is possible subject to a specific agreement

Prism strength

d i s r a p i d – Industrial flooring

  • Compressive strength > 50 N/mm²
  • Flexural tensile strength > 6 N/mm²

Joints

  • Low shrinkage and low cracking, therefore seamless across the surface
  • Pressed joints at the exposed edges
  • Building joints must be formed using suitable joint profiles

Installation requirements

Substrate:
Concrete, minimum grade C20/25 (B 25) or d i s p a c – Foundation slab, surface firm, rough, open-pored, free from slurry, release films and loose particles